| Engineering Improvement Project |
| - Spirit of Innovation and Continuous Improvement, Deep Understanding in System |
| |
We strongly believe that users know more about the advantages and weakness in the system than the OEM. And designs of system made by the OEM always have rooms for improvement. After the OEM sells semiconductor processing equipment to a customer, the customer will have ten to twenty years working with the system. With the additional differences in the requirement of manufacturing process, the initial design made by the OEM no long could satisfy the ever changing needs to the customer unendingly pursuing perfection. We understand the existence of such needs. And with many years of experience working with reputed semiconductor manufacturers we have accumulated rich experience and performance in engineering improvement projects. Based on the “Spirit of Innovation and Continuous Advance and the Deep Understanding in the System”, we believe TSSC could provide the best solutions to customer’s needs in the Engineering Improvement Project. |
| |
| |
We Group the Engineering Improvement Projects of Semiconductor
Manufacturing Equipment into the following: |
|
|
Parts Improvement |
Parts initially designed by the OEM are having very shot lifetime. |
Stability Improvement in Machine |
Certain designs made by the OEM are not complete, leading to instability in some systems. |
Alarm System Improvement |
Due to oversights in initial design or for more accurate alarm system, interlocks are added or the standard of alarm is tighten through improvement of engineering.
|
Old System Improvement |
Parts used in the old systems are difficult to secure, or parts with more and stronger functions are available for replacement with advances in technology.
|
Customized Engineering Improvement |
Customer’s special needs in manufacturing process result in the initial design made by the OEM could no longer satisfy customer’s requirement.
|
|
|
|
|
|
|
| |
| |
| Below are some of our performances in engineering improvement: |
| |
| RF Feedthru Life Time Increasing Project |
| |
 |
| |
| |
| |
| Prevent Heater Breaker Triggering Issue Project |
| |
 |
| |
| |
| |
| External Interlocks Installation Project |
| |
 |
| |
| |
| |
| Cooling System Modification Project |
| |
 |
| |
| |
| |
| RF Match Box Improvement Project |
| |
 |
| |
| |
| |
| RF Match Box Components Improvement |
| |
 |
| |
| |
| |
| RF Match Box Performance Improvement |
| |
 |